Decatur, AL
(256) 227-2986

Real jobs, our own photographs

The work, in the order we do it

These are buildings and grounds in the Tennessee Valley, photographed on the job. The run starts on the floor inside and ends on the ground outside, which is how a Rainey’s contract usually runs too.

Inside

A crew member running a floor machine across a foamed concrete floor in a wood panelled room
Stripping a concrete floor back to bare
Close view of a floor machine pad working through foam on a concrete floor
The machine that does the work
A polished terrazzo floor reflecting overhead lighting
Refinished and reflecting the ceiling
A maintained vinyl composition tile floor with a high finish
VCT held on a burnishing cycle
A corridor floor maintained to a high gloss
A corridor kept, not rescued
A school corridor with lockers and a maintained hard floor
Institutional floors, term after term
A long school corridor with a polished floor running into the distance
The full run, done overnight
A crew member vacuuming an office floor
After hours in an office
A crew member running an extraction wand down a carpeted stair run
Extraction on a stair run
A crew member cleaning newly installed laboratory casework
Handover clean on new casework
Laboratory benches masked and prepared during a post construction clean
Prepped before the final pass

Outside

A concrete walkway edged against fresh mulch borders
Walk edged, borders cut in
A commercial planting bed with fresh red mulch and clipped shrubs
Beds turned over and mulched
Bedding plants set into fresh red mulch
Colour at the entrance
A crew member spreading red mulch beside the company van
Mulch going down
A zero turn mower being used along a brick boundary wall
Cutting to the wall line